S.B. Roll no__________
BUILDING CONSTRUCTION
3rd Exam/Civil/5144/May’o6
Duration : 3 Hrs.
1.
Fill in
the blanks
a.
Part of
building constructed above G.L is called ____
b.
Device
provided for protection form lightering is called________
c.
Standard
size of brick tile is ________
d.
_________
is used to break continuity of vertical joints in walls.
e.
Thickness
of cement concrete for horizontal DPC is generally ____ mm.
2.
Choose the
correct one
a.
The
primary object of a building is to provide (shade, shelter, protection form
rain)
b.
No
timbering is required for ____ trenches in soil (shallow, deep, wide)
c.
Brick
masonry can be allowed to take ______(tension, shear, compression)
d.
A
continuous group of stairs is called _____(landing ,flight, tread, rise)
e.
Width of a
stair should not be less than (0.5m, 1m, 1.5, 2m)
3.
State true
or false
a.
Up keeping
is called maintenance of building.
b.
Sealing
compound should be resistant to oil and fuel.
c.
Pointing
is preferred to plastering for 2nd class brickwork.
d.
Out ward
slope of in 45 is given to bathrooms.
e.
The
opening provided on the top of the door is called ventilator.
Section –B
Note : Attempt any ten question
4.
a.
Why the
sills are provided?
b.
Define a
public building.
c.
Show by
free work and back work in masonry?
d.
What is
face work and back work in masonry?
e.
Define
bearing capacity of soil
f.
Show a
keystone in area with free hand sketch.
g.
What is
reinforced brickwork?
h.
List the
various types of D.P. course materials.
i.
Give
salient features of English bond.
j.
How color
witch is different than distemper?
k.
How the strengthening of sub soil can be done?
l.
Where
bifurcated stairs are recommended?
Section- C
Note : Attempt any three
questions
5. How a new
brickwork is bonded to an old brickwork? Give details of maintenance of brick masonry.
6.
How a
doorframe is placed in position? Take the help of a sketch. Give points to be
kept in view.
7.
Describe
preventive measures for termites to be taken in existing building and steps to
be taken at the time of c construction of a new building.
8.
Name the
various types of damp proofing materials and give the use of these materials in building construction procedure.