No of Questions : 07]
MBA (Sem.-3rd )
PRODUCTION PALNNING & CONTROL
SUBJECT CODE:
MB-941
Paper ID:
[C0154]
Time
: 03 Hours
Maximum
Marks
Instruction
to Candidates:
1) Section - A is Compulsory.
2) Attempt any Four questions from Section - B.
Section - A
1.
a. Route
sheet
b. Product
selection
c. Forward
and Backward scheduling
d. Dispatching
e. Infinite
and finite loading
f. Job
shop production
g. Design
of production line
h. Product
type plant layout
i.
Batch production
j.
Capacity installed and
capacity utilized
Section
–B
2. Outline
and compare various types of production systems.
3. “The
guiding principle in determination of optimum location of a plant is minimizing
the per unit cost of output.” Discuss.
4. Write
short notes on :
a. Master
production schedule
b. Material
requirement planning
5. What
do you understand by sequencing? How is it useful in production management?
6. Illustrate
the inventory control model used for batch production.
7. What
is production planning and control? What are its main element and functions?