S .B. Roll no _____
CONCRETE
TECHNOLOGY
4th
Exam / civil / 5161/ May’05
Duration 3 hrs
Section – A
1.
Fill in the blanks
a.
Fresh concrete is liable to ____ an drying.
b.
When fully saturated, the bulking of sand is
____
c.
The chemical reaction between cement and water
is called ____ of cement.
d.
Concrete with higher compaction factor has
______ workability
e.
Quantity of cement measured by _____
State True of false
a.
Strength of cement decreased by long storage
b.
The ratio of cement sand : Aggregate in M15 is
1:1:2
c.
For compressive strength of cement, ordinary
sand is used
d.
Concrete should have maximum shrinkage.
e.
At freezing point, concrete sets easily.
Choose the correct one
a.
Less the water cement ratio, (lesser/ greater)
is the strength of concrete
b.
Bulking of sand is (more/ less ) when the
particles are fine.
c.
Concrete is (permeable / impermeable ) to
moisture.
d.
If the slump is 20 mm, then the degree of
workability is (high / low)
e.
The concrete in which preliminary tests are
conducted is called (controlled / ordinary) concrete
Section –B
Note : attempt any ten questions.
2.
a.
What are the desired properties of hardened
concrete ?
b.
What are the constituents of cement?
c.
How gypsum delays the setting time?
d.
Why concrete should be workable?
e.
What do you mean by fineness mod?
f.
What is the importance of steerage of cement?
g.
What is weight batching of concrete?
h.
Define and list equipments for machine mixing of
concrete ingredients.
i.
Define compaction of concrete and why done?
j.
Define bleeding. w/c ratio, w.r.t concrete
k.
Sketch one form work for column circular in
shapes.
l.
What do you mean by flash? Explain in brief.
Section
–C
Note : Attempt any three questions.
3.
Give the list of stages through which the entire
concreting operations have to be completed
4.
List he different types of Portiand cement , and special types of
cement. Explain any one.
5.
Write short note on
a.
Effect of storage an strength of cement
b.
Curing of concrete
6.
Explain the various factors, which improve the workability of concrete work.
7.
With the
help of neat proportionate sketch. Describe the slump cone test’ for concrete
why this test is performed ?