Roll No_________
WATER SUPPLY AND
WASTE WATER ENGINEERING
4th
Exam /Civil/4451/May’10
Duration 3 Hrs.
1.
Fill in the blanks
a.
The field of a well depends mainly upon ______
b.
The cleaning of slow sand fitter is done by
______
c.
AGI pipe has a coating of _______
d.
Chlorination of water is done for _______
e.
Water supply scheme is usually designed for a
period of ______
f.
pH value of fresh sewage is expected to be
_______
g.
the minimum diameter of server pipe is _______
h.
the gas that is mainly responsible for explosion
in sewer is ______
i.
The septic tank should be cleared at regular
interval but should not exceed ________
j.
Traps are used in household drainage system to
_____
State true or false
k.
Sewage consists of water only and solid matter
is hardly present.
l.
The colour of water is measured on well scale.
m. The
aim of disinfection is to kill all the microorganism in water.
n.
Water meter is used to measure the quantity of
sewage
o.
Trickling fitters remove organic matter.
Section
–B
Not e: Attempt any ten questions
2.
a.
List out the factors affecting per capita
demand.
b.
Explain about quality and quantity of surface
water.
c.
Give the chemical standards of water used for
domestic purpose
d.
Explain the functions of sedimentation.
e.
Explain advantages and disadvantages of concrete
pipe.
f.
Explain lowering of pipe i.e. water supply pipe
into the trench
g.
List out the various fixture used in internal
water supply
h.
Explain self cleaning velocity.
i.
Explain advantages and disadvantages of combined
system.
j.
Explain sewage sickness.
k.
Explain advantages of tricking fitters.
l.
Explain
the aims of building drainage.
Section – C
Note : Attempt any three question
3.
a.
Explain arithmetic increase method with example
b.
Explain infiltration wells with neat sketch.
4.
a.
Compare slow sand filter and rapid sand fitter
b.
Explain
briefly grid iron distribution system.
5.
a.
Explain the factors affecting dry weather flow.
b.
Explain manholes, it subjects and location .
6.
a.
Explain disposal sewage by land treatment
b.
Explain the points should be kept in mind for house drainage
c.
Explain objectives of screens
0 comments:
Post a Comment
North India Campus